Operating model clause 14, rendered to ABBI-PROGRESS-REPORTING-STANDARD · regenerated from live Hive Mind, gate cache and certificate state at 2026-10-11 11:17 UTC · compass row 297d6492 v1 selected by liveness gate over 72 is_latest candidate(s): ALL 72 candidate(s) probed DEAD; rendering the most recently updated one rather than refusing -- a terminated session's plan is still the plan · session 95440432 · project resolved from --project/--abbi-number or $ABBI_PROGRESS_PROJECT · generated-at 1791717473.
ROW SELECTION — TERMINATED / STALE — no candidate session for this project is alive; this plan is being rendered from a session that has ended
Selected compass row 297d6492 · session 95440432 · liveness DEAD
Reason: ALL 72 candidate(s) probed DEAD; rendering the most recently updated one rather than refusing -- a terminated session's plan is still the plan
Liveness checked at 2026-10-11 11:17:50 UTC over 72 candidate(s); computed per render and NEVER written back to the database.
DEGRADED — published anyway and named, per PRS §9.4. no_predicate=9 · not_re_derivable=9 · plan_defect=9 · served_was_stale=1
0/4
Deliverables re-derived complete
C8 from the deployed artifact, not the status field (PRS §2.2)
0/0
Tasks re-derived complete
9 rows excluded: not re-derivable (PRS §2.2.3c)
0
RECONCILE rows
C8 disagrees with C9 (PRS §2.2.2d discrepancy tile)
7
Gate: authorized
0 executed · 2 pending · 0 refused
PASS
Completion certificate
1791684902-419f4b39.json
True
Changed vs served
hash of the normalised fresh render vs the SERVED bytes (PRS §9.3a)
Progress lives here, not in chat. Operating model clauses 18 and 20. Every figure is MEASURED, COUNTED or RESAMPLED (PRS §2.1.1); anything else renders one of the four §2.1.4 unknown tokens. Task STATE is re-derived from the deployed artifact at render time and the stored claim is shown beside it (PRS §2.2).
Estimated completion — clause-7k ETA. The est-completion column carries a per-element PLANNED projection rolled up over the dependency graph (dependent tasks SUM, concurrent tasks take the MAX), sourced from the SESSION_COMPASS plan + task_state and the session wait windows (0 wait-stage window(s) (Approval/PIN, Pause) from session_asom_events for 95440432; PRS §6.2.5 — a blocked task does not burn its estimate while blocked). It is the clause-7k INPUT shown labelled "planned" (PRS §2.1.2), ADDITIVE beside the §6.2 overrun comparison and the §6.4 resampled band; a task with no estimate renders —, never 0 (PRS §3). OBJ-09 D4.3: the same board data the console reads.
Session timeline — the 9 ASOM stages (OBJ-06 T6, D2/D4)
Full stage-by-stage history. Every stage in the ASOM vocabulary is named, whether or not this session has reached it yet (NOT REACHED is a real status, never a dropped row). Sourced from 12 element_kind='task' row(s) from the durable session_board_current projection for 95440432.
Stage
Status
Occurrences
Duration
Objective
COMPLETE
1
0s
Deliverables
COMPLETE
1
0s
Plan
IN PROGRESS
1
12h17m
Approval/PIN
NOT REACHED
0
NOT REACHED
Execution
NOT REACHED
0
NOT REACHED
Completion-gate
NOT REACHED
0
NOT REACHED
Pause
NOT REACHED
0
NOT REACHED
End
NOT REACHED
0
NOT REACHED
Exit
NOT REACHED
0
NOT REACHED
Project — counted progress and the PRS §6.4 resampled band
Counted completion
Estimated completion — clause-7k ETA + PRS §6.4 band
Critical-chain depth (PRS §6.3.2)
Provenance
NOT RE-DERIVABLE — every row excluded, no denominator (PRS §6.3.4)
planned ~2026-10-11 11:57 UTC (40m00s remaining) · clause-7k critical path over 9 task(s)
Deliverables — counted fraction and critical-chain depth (PRS §6.3)
C1 Deliverable
Text
C7 Estimated completion
Chain depth
C8 State (re-derived)
C9 State (claimed)
C10 Exclusions
D1
D1: Unified TYPE + STATUS from one authoritative source, persisted at source (console reads the session_type column, retire independent recompute; wait/pin/error persisted to lifecycle_state at the source event; stale-u-pin bug closed). Verified: live OBJ/PM/Task sessions show correct TYPE+STATUS read from stored columns; parked post-CGR session no longer shows stale u-pin.
NOT RE-DERIVABLEplanned ~2026-10-11 11:57 UTC (40m00s remaining) · clause-7k critical path over 5 task(s)
0
NOT RE-DERIVABLE
open
5 rows excluded: not re-derivable
D2
D2: Durable ASOM stage + per-stage timing (new session_asom_events(session_id,stage,entered_at,exited_at,source) written source-side by transition hooks; console side-file backfilled; console+progress-site read stored rows). Verified: a real OBJ session's 9 stages and time-in-each-stage reconstructable from the table alone, incl. stages before first console poll.
NOT RE-DERIVABLEplanned ~2026-10-11 11:32 UTC (15m00s remaining) · clause-7k critical path over 1 task(s)
0
NOT RE-DERIVABLE
open
1 rows excluded: not re-derivable
D3
D3: Enforced per-task ETA (clause 7k estimate_minutes required at plan-pin; asom.py TIME_NOT_ESTIMATED armed) + per-element ETA rollup (remaining=estimate-elapsed; task->deliverable->objective). Verified: a pinned plan without estimates is refused; a pinned plan yields live per-task/per-deliverable/objective ETA.
NOT RE-DERIVABLEplanned ~2026-10-11 11:47 UTC (30m00s remaining) · clause-7k critical path over 2 task(s)
0
NOT RE-DERIVABLE
open
2 rows excluded: not re-derivable
D4
D4: Unified realtime session-board record + endpoint co-locating objective + deliverables (status) + execution-plan tasks (status+ETA), rendered in console detail pane and clause-14 progress site; dead ETC/ETA fields populated. Verified: a real OBJ session's board shows objective, each deliverable status, each task status+ETA live in both surfaces from durable state.
NOT RE-DERIVABLEplanned ~2026-10-11 11:32 UTC (15m00s remaining) · clause-7k critical path over 1 task(s)
0
NOT RE-DERIVABLE
open
1 rows excluded: not re-derivable
Tasks — the ten PRS §4 columns, grouped under each deliverable
D1 — 5 tasks
C1 DELIVERABLE
C2 TASK
C3 EXECUTION TYPE
C4 DEPENDS ON
C5 MODEL EXECUTING
C5B AGENT
C6 TIME ELAPSED
C7 ESTIMATED COMPLETION
C8 STATE (RE-DERIVED)
C9 STATE (CLAIMED)
C10 EVIDENCE
C11 PROGRESS
D1
A.D1.1 pin-satisfy write at authorize-v200-cloud.py (session-scoped pin->running, exit-code safe)
NOT MEASURED
none
anthropic
deliverable-build-agent
COMPLETED (unmeasured)
INSUFFICIENT DATA n=0<5planned 15m (plan declaration, PRS §2.1.2)planned: 15m00s left